久久久久立洲AV无码AV蜜桃_成人国产日韩欧美另类在线_欧美一区精品视频一区二区_亚洲va久久久噜噜噜女同

Operating procedures for gantry machining center

Date:03-20    Belong to:Company News
Operating procedures for gantry machining center - Check if all power switches, buttons, and function keys are normal - After entering the program flow, carefully check the CNC lathe machining code
Before starting, carry out a comprehensive and delicate inspection of the CNC lathe, including the control panel, slide surface, lathe chuck, lathe tool holder, tool table, CNC blade, etc. Only after confirming accuracy can actual operation be carried out< Br/>


1. After the CNC lathe is powered on, check whether all power switches, buttons, and function keys are normal and flexible, and whether there are any abnormal situations in the CNC lathe< Br/>


2. After entering the program flow, carefully check the CNC lathe machining code, detailed address, standard value, absolute value symbol, and decimal places< Br/>


3. Properly and accurately measure and calculate the plane coordinates of steel components. And conduct verification of personal income results& Amp; Nbsp& Middle; Type in the plane coordinates of the steel component and align the coordinates. Carefully check plane coordinates, absolute value symbols, and decimal places



4. Before installing the steel parts, conduct a program process by air freight to see if the program process can proceed smoothly, whether the installation of CNC blades and fixtures is effective, and whether there is a&quo; Overtravel< Br/>


5. When cutting, quickly fold the power switch and make sure to set it to the minimum gear< Br/>


6. When drilling down the tool, when the CNC blade operates to a distance of 30-50mm from the steel part, it is necessary to verify whether the remaining values of the Z-axis and X-axis coordinates are consistent with the production and processing program flow while maintaining the tool path< Br/>


7. In drilling and production processing, after cutting and replacing CNC blades, it is necessary to accurately measure the position of the CNC blade again and change the tool compensation value and number< Br/>


8. After making changes to the sequence, it is necessary to carefully verify some of the changes< Br/>


9. The CNC lathe can only be started after confirming the clamping of the steel parts. It is prohibited to accurately measure or touch the steel parts during rotation< Br/>


10. When there are abnormal phenomena such as steel parts shaking, shaking, abnormal noises, and loose fixtures during production, it is necessary to park the vehicle to solve them< Br/>


11. After emergency parking, the CNC lathe should be operated again; Return to Zero; Only through practical operation can the program process be operated again< Br/>
nine hundred
logo
Scan the QR code, follow the official account for more information

Contact:Mr.zhou

Mobile:13924586646

Telephone:0755-29423909

Email:sz_jdsk@163.com

Address:Bright new district of shenzhen hai westfield neighborhood community fourth industrial zone 6 area A house

Branch address: No. 199 Longshan Road, Ma'anshan Economic and Technological Development Zone/Office: No. 1399 Sufu Road, Xukou Town, Wuzhong District, Suzhou City, Jiangsu Province
Shenzhen carved CNC Equipment Co., Ltd. Copyright ICP 14057583 
久久久久立洲AV无码AV蜜桃_成人国产日韩欧美另类在线_欧美一区精品视频一区二区_亚洲va久久久噜噜噜女同